Water Resource Management

Material Topics: Water Resource Management; Corresponding Sustainability Principle: Sustainable Development (GRI 2-25、3-3)

Management Approach and Elements
Importance to APC

Global warming has led to extreme weather. In recent years, government units, stakeholders, and the company internally have gradually paid attention to water resources management. Through water-saving measures and water-saving plans, precious water resources are circulated, recycled, and reused.

Management Approach and Objectives
  • Focusing on source process improvements, supplemented by end-of-pipe treatments, to enable water resources circular reuse.
  • Continuously implementing water-saving measures, emission reductions, and water recycling management.
Strategy
  • Water recycling rate management tracking
  • Continuous management tracking of water consumption per unit of product
  • Continuous management tracking of water-saving related process improvement cases
  • The data boundary for water resources management is the Linyuan Plant, with a data coverage rate of 100%.
Management Impact
Positive/Negative Impacts
  • Positive actual impact - Improving the water recycling rate reduces production costs
  • Negative actual impact - The collection of water consumption fees increases production costs
Negative Remediation and Preventive Measures
  • Cooperating with the public sector's phased water-saving plans, the plant implements three-stage water-saving measures, which can save 10% of water consumption.
  • Continuously track and manage water recycling rates, water consumption per unit of product, and water-saving process improvement cases.
Management Approach Targets and Performance
2025 Targets
  • Water recycling rate > 95%
  • Water consumption per unit of product: < 4.0 M3/MT
2025 Performance
  • Water recycling rate: 97.3%(✓)
  • Water consumption per unit of product: 3.78 M3/metric ton(✓)
Short-term Targets(< 3 years)
  • Water recycling rate > 96%
  • Water consumption per unit of product: < 3.9 M3/metric ton
Mid-to-Long-Term Targets (≧ 3 years)
  • Water recycling rate > 97%
  • Water consumption per unit of product: < 3.8 M3/metric ton
  • Annual water-saving related process improvement cases ≧ 1
Evaluation of Management Approach
Effectiveness Evaluation
  • Water saving statistics
  • Water bills
  • Regular calibration of flow meters
  • Tracking and managing water consumption per unit of product via ISO 9001
Grievance Mechanism
  • "Sustainable Development Section" on the APC official website
  • Environmental impact grievance channel
Management Approach Adjustments
  • Explain the implementation status of independent water saving and the water-saving rate at regular plant affairs meetings, and conduct rolling reviews.
  • Discuss the implementation progress and construction methods of water-saving related improvement cases at regular technical exchange meetings.

Water Source for the APC Linyuan Plant (GRI 2-4、303-1、303-3、303-4、303-5) (SASB RT-CH-140a.1)

Water Resources Risk Level
Low-Medium 10~20%
Water Resources Sources

Third-party water

Category:Freshwater (≦ 1,000 mg/l Total Dissolved Solids)

Tap Water

Supplied by the Gaoping River Weir via the Fengshan Reservoir

Pure water

Supplied by the Taiwan VCM Corporation

  1. Adopted the water risk assessment tool developed by the World Resources Institute (WRI).
  2. The data boundary for water resources management is the Linyuan Plant, with a data coverage rate of 100%.
  3. The Company defines areas with water stress exceeding 40% as water-stressed areas, serving as an important basis for water management and risk response.
Item 2024 2025 Variance
Linyuan Plant Total Water Withdrawal (Thousand Cubic Meters) 485.689 527.110 Increase 8.5%
Linyuan Plant Water Discharge Volume (Thousand Cubic Meters) 170.558 180.667 Increase 5.9%
Linyuan Plant Total Water Consumption (Thousand Cubic Meters) 315.131 346.443 Increase 9.9%
Water Recycling Rate (%) (Reuse Rate, R2) 97.50 97.30 Decrease 0.2%
R2 = (Total circulated water + Total recycled water + Rainwater withdrawal + Condensate withdrawal - Cooling tower internal circulation volume) / (Total withdrawal + Total reused water + Total circulated water - Cooling tower internal circulation volume) × 100%

Note:Information re-compiled

  1. After assurance by a third-party verification unit, water withdrawal (newly incorporating pure water and water truck loads).
  2. The water recycling rate is now presented using the R2 calculation method.
In 2025, water consumption per unit of product was 3.78 m³/metric ton, an increase of 2.16% compared to the previous year, but remaining below the target threshold of 4.0 m³/metric ton.
Recycled and reused water at APC’s Linyuan Plant includes condensate recovery and cooling tower water recirculation. Calculated in accordance with the water indicators specified in the "Directions for Review of Water Use Plans" promulgated by the Ministry of Economic Affairs, the water recycling rate (R2) in 2025 was 97.30%, a slight decrease of 0.2% from the previous year. The water consumption per unit of product and water recycling rate at the Linyuan Plant over the past three years are shown in the figure below.
Although abundant rainfall in recent years has mitigated water resource risks in the Kaohsiung region, the Company remains focused on the potential impacts of extreme weather events. We will continue to maintain full preparedness and rigorously execute water resource management.

Linyuan Plant Water Intensity Trend

Note: The 2025 target value for water intensity is 4.0 M3/ton

Water Consumption per Unit of Product and Water Recycling Rate at the Linyuan Plant for the Past Three Years

Effluent Management (GRI 303-2)

The manufacturing process at the Linyuan Plant involves gas compression reactions to produce solid polyethylene resin products. Tap water is used on-site for equipment cooling, pelletizing cooling, and product storage tank cleaning, after which it is collected in equalization tanks. Consequently, the discharged wastewater remains uncontaminated and is discharged at quality levels exceeding statutory regulations, routed through underground pipelines into a dedicated sewer system to the Linyuan Industrial Park Wastewater Treatment Plant for processing.
In 2025, total effluent discharge volume was 180,667 m³, representing a 5.9% increase compared to 2024. However, effluent discharge per unit of product decreased to 1.29 m³/metric ton relative to 2024, primarily due to a 26% increase in low-density polyethylene (LDPE) production and a 6.44% increase in overall production output.
The primary effluent testing parameters at the Linyuan Plant include Suspended Solids (SS), Chemical Oxygen Demand (COD), and pH value. All regularly tested and reported items fall well below the sewerage intake water quality standards. The testing results for key water quality parameters of APC's Linyuan Plant's effluent over the past three years are shown in the table below:

Unit: mg/L

Testing Item 2023 2024 2025 Discharge Standard
Suspended Solids 5.51 11.29 3.90 ≦ 25
Chemical Oxygen Demand 32.77 38.57 20.78 ≦ 90
pH Value 7.46 7.39 7.60 6~9
In 2025, all effluent water quality control testing parameters remained within compliant limits, and zero discharge permit violations occurred. (GRI 303-2) (SASB RT-CH-140a.2)

Water Conservation Measures

Asia Polymer Corporation’s (APC) primary water consumption stems from process heat removal equipment and evaporative loss in cooling towers. Over the years, the Company has progressively implemented various water conservation initiatives, including replacing absorption chillers with electric chillers, waste heat recovery, pelletizing soft water management, and increasing cycles of concentration in cooling water systems. In 2025, by maintaining heat exchanger efficiency and repairing leaking equipment, water consumption per unit of product remained at the previous year's level.
In recent years, abnormal climate patterns driven by global warming have led to increasingly severe domestic water shortages. In response, besides implementing phased water rationing measures, the government has actively integrated wastewater volumes from various processing zones and industrial parks to plan and build centralized water reclamation plants. Following an evaluation of the capital construction and operating costs of an on-site wastewater recycling system, APC decided to defer building a small-scale in-house system. Instead, the Company plans to align with government water recycling policies by partially utilizing reclaimed water from government-built facilities for plant operations, creating a win-win outcome for both the government and the enterprise. (SASB RT-CH-140a.3)

Stage 1

  • Advocate water conservation among employees
  • Recycle office washing water for watering plants
  • Use discharged pelletizing water and cooling water for low-grade water purposes

Stage 2

  • Increase the cycles of concentration in cooling towers (from 5.5 to 7.5 times)
  • Reduce the frequency of fire water testing and postpone fire drills
  • Reduce the makeup water for pelletizing in production lines
  • Suspend non-essential cleaning of product storage tanks and floors

Stage 3

  • Temporarily suspend water supply for employee showers
  • The distillation and purification system can only be started when the recovery tank reaches a high liquid level