Water Resource Management
Water Resources Risk Level
Low-Medium 10~20%
Water Resource Source
Third-party water
Category: Freshwater (≦ 1,000 mg/l Total Dissolved Solids)
Tap Water
Supplied by the Gaoping River Weir via the Fengshan Reservoir
Pure water
Supplied by the Taiwan VCM Corporation
- Adopted the water risk assessment tool developed by the World Resources Institute (WRI).
- The data boundary for water resources management is the Linyuan Plant, with a data coverage rate of 100%.
- The Company defines areas with water stress exceeding 40% as water-stressed areas, serving as an important basis for water management and risk response.
| Item |
2024 |
2025 |
Variance |
| Linyuan Plant Total Water Withdrawal (Thousand Cubic Meters) |
485.689 |
527.110 |
Increase 8.5% |
| Linyuan Plant Water Discharge Volume (Thousand Cubic Meters) |
170.558 |
180.667 |
Increase 5.9% |
| Linyuan Plant Total Water Consumption (Thousand Cubic Meters) |
315.131 |
346.443 |
Increase 9.9% |
| Water Recycling Rate (%) (Reuse Rate, R2) |
97.50 |
97.30 |
Decrease 0.2% |
| R2 = (Total circulated water + Total recycled water + Rainwater withdrawal + Condensate withdrawal - Cooling tower internal circulation volume) / (Total withdrawal + Total reused water + Total circulated water - Cooling tower internal circulation volume) × 100% |
Note: Information re-compiled,
- After assurance by a third-party verification unit, water withdrawal (newly incorporating pure water and water truck loads).
- The water recycling rate is now presented using the R2 calculation method.
Water consumption per unit of product and water recycling rates for APC Linyuan Plant over the past three years are illustrated in the figure below:
In 2025, water consumption per unit of product was 3.78 m³/MT, representing an increase of 2.16% from the previous year but remaining below the target threshold of 4.0 m³/MT.
Effluent Management (GRI 303-2)
The manufacturing process at APC Linyuan Plant involves gas compression reactions to produce solid polyethylene resin products. Municipal tap water is utilized on-site for equipment cooling, pellet cooling, and cleaning product storage tanks, after which it is collected in equalization basins. Consequently, the discharged water remains uncontaminated and consistently outperforms regulatory standards. It is conveyed via underground pipelines into a dedicated sewage system and discharged to the Linyuan Industrial Park Wastewater Treatment Plant for centralized treatment.
In 2025, total effluent discharge volume reached 180,667 m³, an increase of 5.9% compared to 2024. However, wastewater discharge per unit of product decreased to 1.29 m³/MT from 2024 levels, primarily driven by a 26% increase in low-density polyethylene (LDPE) production capacity and a 6.44% growth in total production output.
The primary effluent monitoring parameters at the Linyuan Plant include suspended solids (SS), chemical oxygen demand (COD), and pH value. All regularly tested and reported parameters remain well below sewer discharge standards. Test results for major effluent water quality parameters at APC Linyuan Plant over the past three years are summarized in the table below:
In 2025, all monitored effluent water quality parameters remained within permissible compliance limits, and there were no incidents of non-compliance with discharge permits. (SASB RT-CH-140a.2)
Water Conservation Measures
APC’s primary water consumption stems from process heat removal equipment and evaporative losses in cooling towers. Over the years, the company has progressively executed multiple water conservation initiatives, such as converting absorption chillers to electric models, waste heat recovery, softened water management for pelletizing, and increasing cycles of concentration (CoC) in cooling water systems. In 2025, through efforts to maintain heat exchanger efficiency and repair leaking equipment, water consumption per unit of product remained on par with the previous year.
In recent years, climate anomalies driven by global warming have intensified domestic water scarcity across Taiwan. In response, beyond implementing phased water rationing measures, the government has actively consolidated wastewater streams from export processing zones and industrial parks to plan and construct centralized reclaimed water plants. Following an evaluation of capital expenditures and operating costs for an on-site wastewater treatment and reclamation system, APC decided to defer building a small-scale in-house facility. Instead, the plant is formulating plans to align with government water reclamation policies, aiming to partially adopt reclaimed water from government-built facilities for internal operations to achieve a win-win outcome for both the public sector and the enterprise. (SASB RT-CH-140a.3)
Note:The 2025 target value for water intensity is 4.0 M³/ton.
APC Linyuan Plant’s Response Measures to Government Phased Water Rationing:
Stage 1
- Advocate water conservation among employees
- Recycle office washing water for watering plants
- Use discharged pelletizing water and cooling water for low-grade water purposes
Stage 2
- Increase the cycles of concentration in cooling towers (from 5.5 to 7.5 times)
- Reduce the frequency of fire water testing and postpone fire drills
- Reduce the makeup water for pelletizing in production lines
- Suspend non-essential cleaning of product storage tanks and floors
Stage 3
- Temporarily suspend water supply for employee showers
- The distillation and purification system can only be started when the recovery tank reaches a high liquid level
☆ The three-phase measures achieve water savings of approximately 10%; if necessary, water supply will be supplemented by procuring groundwater delivered via water tankers.