Greenhouse Gas Management
In Q3 2022, APC commissioned an independent third-party verification body to complete greenhouse gas (GHG) inventory verification in accordance with ISO 14064-1, registering the results on the Ministry of Environment's (MOENV) designated platform. Regulatory authorities mandate that APC's consolidated subsidiaries complete GHG inventories by 2025 and obtain verification/assurance by 2027; APC completed both the GHG inventory and assurance for its consolidated subsidiaries ahead of schedule in Q2 2024.
The operational boundary of the Linyuan Plant encompasses direct (Scope 1), energy indirect (Scope 2), and other indirect (Scope 3) GHG emissions. These emissions primarily comprise five types of greenhouse gases: carbon dioxide (CO₂), methane (CH₄), nitrous oxide (N₂O), hydrofluorocarbons (HFCs), and sulfur hexafluoride (SF₆), with emissions quantified in CO₂ equivalent (CO₂e) based on Global Warming Potential (GWP) values from the IPCC Sixth Assessment Report (AR6).
Furthermore, in response to the carbon fee mechanism—following the MOENV's announcement of three related sub-regulations, including the Carbon Fee Collection Regulations, on April 29, 2024—APC submitted a Voluntary Reduction Plan in 2025 and obtained approval for the preferential rate from the central competent authority. APC remains committed to advancing its energy conservation and decarbonization performance, conducting annual reviews against its decarbonization pathway to achieve the Group's 2030 emissions reduction targets and the 2050 carbon neutrality goal.
GHG emissions by scope and GHG intensity per unit of product for APC Linyuan Plant over the past three years are illustrated in the figure below: (GRI 305-1、305-2、305-4)
Note
1.Electricity emission factor: Calculated based on 2025's 0.466 (kg CO₂e/kWh); Purchased steam emission factor: Calculated based on 2025's 0.1486839492 (tonnes CO₂e/ton)
2.Greenhouse gas emissions: Scope 1 refers to direct emissions from processes or facilities. Scope 2 refers to indirect energy emissions, such as purchased electricity (supplied by Taipower) and purchased steam (supplied by FPC Linyuan Plant).
3.Greenhouse gas emissions = (Energy fuel usage) × (Emission factor announced by the Ministry of Environment) × (IPCC GWP required by the Ministry of Environment)
4.Converted to carbon dioxide emission equivalents based on Version 6.0.4 of the Greenhouse Gas Emission Factors announced by the Ministry of Environment and the GWP values from the 2013 IPCC Fifth Assessment Report.
5.Data boundary: Asia Polymer Corporation (Taipei Office, Linyuan Plant), APC (BVI) Holding Co., Ltd., USI International Corp., USI Trading (Shanghai) Co., Ltd (USITA), APC Investment Corporation (APCIC).
6.Information restatement: The scopes for the past three years are presented as "Consolidated Parent and Subsidiary Companies." Since the carbon emissions of the inventoried sites do not exceed 5% of the total emissions, and there are no major operational changes, the emission data from the first year (2023) will be used for calculation.
Greenhouse Gas Emission Intensity over the Past Three Years
Unit (tonnes CO₂e/ton)
Unit (tonnes CO₂e/NT$ million revenue)
1.600
1.400
1.200
1.000
0.800
0.600
0.400
21.00
18.00
15.00
12.00
9.00
6.00
3.00
0.00
16.10
16.74
17.73
0.818
0.770
0.730
In 2025, APC’s total greenhouse gas (GHG) emissions reached 101,839 MT CO₂e, representing an increase of 0.86% compared to 2024. In terms of production output, GHG emissions intensity was 0.730 MT CO₂e/MT, a 5.19% decrease from 2024. This reduction was primarily driven by product mix adjustments aligned with market demand, process pressure optimizations, fewer equipment breakdowns, and an increase in overall production capacity.
Alternatively, calculated on a financial basis, GHG emissions intensity was 17.73 MT CO₂e per NTD million in revenue, up 5.91% from the previous year. This increase was primarily attributable to subdued product selling prices, which led to lower annual revenue.
Direct greenhouse gas emissions (Scope 1) 10,548 tonnes CO₂e, accounting for 10.4%
Data boundary: Consolidated parent and subsidiary companies
GRI305-1
SASB RT-CH-110a.1
Assurance Report
Energy indirect greenhouse gas emissions (Scope 2) 91,291 tonnes CO₂e, accounting for 89.6%
Data boundary: Consolidated parent and subsidiary companies
GRI305-2
Other Indirect Greenhouse Gas Emissions (Scope 3)
In accordance with ISO 14064-1 and referencing Annex H of ISO 14064-1:2018, an identification and significance assessment of indirect emissions across Categories 3 to 6 was conducted. Among these, four items under Category 3 (including upstream freight transport, domestic product transportation, employee commuting, and business travel) and nine items under Category 4 (purchased goods) were classified as Scope 3. Total GHG emissions amounted to 325,207 MT CO₂e and received third-party verification.
2025 APC Scope 3 Greenhouse Gas Emissions
| Item |
Emissions (MT CO2e) |
| Category 3.1- Transportation of upstream freight - Vinyl Acetate Monomer (VAM) |
495.4081 |
| Category 3.1- Transportation of upstream freight - Other 5 items (domestic procurement) |
7.9512 |
| Category 3.1- Transportation of upstream freight - Other 5 items (external procurement) |
47.1222 |
| Category 3.2 - Inventory of domestic product transportation (domestic sales) |
805.2524 |
| Category 3.2- Inventory of domestic product transportation (export sales) |
6,620.7237 |
| Category 3.3- Employee commuting (bus, car, motorcycle) |
208.5071 |
| Category 3.5- Employee business trips (high-speed rail, train, taxi, car, motorcycle |
0.6061 |
| Subtotal |
8,185.5708 |
| Category 4.1-Purchased goods (Raw materials)-Ethylene |
228,576.7770 |
| Category 4.1-Purchased goods (Raw materials)-Vinyl Acetate |
66,450.1036 |
| Category 4.1-Purchased goods (Raw materials)-Other electricity |
21,407.8710 |
| Category 4.1-Purchased goods (Raw materials)-Tap water |
109.2461 |
| Category 4.1-Purchased goods (Raw materials)-Sulfuric acid |
9.8173 |
| Category 4.1-Purchased goods (Raw materials)-Lubricating oil |
423.7920 |
| Category 4.1 - Purchased Goods (Raw Materials) - Green Electricity (Solar Energy) |
24.1692 |
| Category 4.4-Disposal of solid waste (Removal Category D + Category R) |
3.3556 |
| Category 4.4-Disposal of solid waste (Incineration) |
16.0812 |
| Subtotal |
317,021.2130 |
| Total |
325,206.7838 |
Other indirect greenhouse gas emissions (Scope 3) 325,207 tonnes CO₂e
Data boundary: Parent company only
GRI305-3
Assurance Report
APC Decarbonization Pathway
In alignment with the USI Group's targets of reducing carbon emissions by 27% by 2030 relative to the baseline year (2017) and achieving carbon neutrality by 2050, APC has formulated its decarbonization pathway and conducts annual reviews of its execution performance.
Energy Conservation Initiatives and Benefits (GRI 302-4)
In 2025, a total of five energy conservation and carbon reduction management initiatives were implemented, with details presented in the figure below:
Process Improvement
- Line 3 chiller replacement
- Packaging machine replacement (power saving for automatic warehouse packaging tower related equipment)
Savings
Electricity: 770,842 kWh
Carbon reduction: 365 metric tons CO2e
Equipment Improvement
- E-1115 steam saving
- E-1111/E-1211 energy-saving improvement
- L4 conveying system depressurization energy-saving project
Savings
Electricity: 1,933,114 kWh
Steam: 611 metric tons
Carbon reduction: 1,026 metric tons
These initiatives achieved total savings of 2,703,956 kWh of electricity and 611 MT of steam, resulting in a greenhouse gas emissions reduction of 1,391 MT CO₂e.
Energy savings and carbon reductions categorized by process improvements and equipment modifications are summarized in the table below:
| Category |
Process Improvements |
Equipment Modifications |
Total |
| Energy Savings |
Electricity (GJ) |
2,776 |
6,960 |
9,736 |
| Steam (GJ) |
--- |
1,738 |
1,738 |
| Reduced carbon (MT CO2e) |
365 |
1,026 |
1,391 |
☆ All greenhouse gas (GHG) emission reductions achieved fall under Scope 2 (energy indirect emissions). (GRI 305-5)
In alignment with government energy conservation policies and the Group's energy management objectives, APC Linyuan Plant has formulated comprehensive energy-saving and carbon-reduction plans and targets. The execution results of these initiatives are compiled and reviewed monthly for milestone tracking and progress control. Furthermore, through the Group's "Resource Integration Meetings" and "Technical Exchange Meetings," the plant shares resources and exchanges experience with peer group companies, fostering cross-organizational collaboration to implement pragmatic and effective decarbonization solutions.
2026 Energy Conservation and Carbon Reduction Plan
In 2026, the plant plans to execute eight energy conservation and carbon reduction measures, projected to save approximately 1.59 million kWh of electricity and 983 MT of steam, reducing GHG emissions by 930 MT CO₂e. The total planned investment for the 2026 energy conservation and carbon reduction initiatives is NTD 71 million.
| Category |
Energy-saving Management Plan |
Plan Target Value |
Total Energy Savings of Plan |
2025 Target Carbon Reduction |
| Process Improvement |
1. MRT energy-saving improvement
|
Steam 983 metric tons |
Electricity 1,590,000 kWh
Steam 983 metric tons |
930 MT CO2e |
| Equipment Improvement |
2. Addition of solar power equipment
3. Line 2 extruder motor replacement
4. Line 1/2 After Cooler booster water pump replacement
5. C-7301A air compressor replacement
6. Line 4 conveying air compressor energy-saving improvement
7. Line 1/2 pelletizing water pump replacement
8. Line 3 pelletizing water pump replacement
|
Electricity 1,590,000 kWh |
APC Linyuan Plant completed the installation of solar photovoltaic (PV) power generation facilities in June 2011, with an installed capacity of 496.08 kW. In 2025, solar power generation reached 520,432 kWh, all of which was sold to Taiwan Power Company (Taipower) under the Feed-in Tariff (FiT) scheme. Cumulative electricity generation totaled approximately 8.47 million kWh by the end of 2025, achieving an emissions reduction of approximately 4,377 MT of CO₂.
The USI Group is currently orchestrating unified planning to steer all affiliated companies toward fulfilling their green power requirements within five years. The Group plans to centrally develop and construct dedicated solar power plants, while supplementing any remaining shortfalls through the procurement of green electricity.
In 2025, APC procured 2.515 million kWh of solar green electricity from Xuan Ju Co., Ltd., an affiliate of the USI Group, with an investment of approximately NTD 13.879 million. Green power wheeling officially commenced on January 1, 2025. In compliance with relevant provisions of the new regulations and in alignment with the Group's overarching strategic plan, the Linyuan Plant will continue working toward the Group's 2050 carbon neutrality goal.
In Q2 2026, the Linyuan Plant will complete the installation of a 494 kW self-consumption solar photovoltaic (PV) system. Combined with the existing 496 kW solar PV facilities and the procurement of 2.515 million kWh of solar green power, the plant has fulfilled the statutory requirement mandating that renewable energy account for 10% of its contracted capacity.